Electric motor flange B5 and B14 compared: type of holes, flange dimensions per frame size, small and large B14, fit at the spigot and tightening torques.

AI This article was created with the help of AI.

Electric motor flange: function and standards

The flange is the interface between the motor and the driven machine, such as a gearbox or a pump. It has two tasks: the spigot aligns the motor coaxially with the mating side, and the bolts create the frictional connection. So that motors from different manufacturers are interchangeable, the mounting dimensions are standardized.

The relevant standard is DIN EN IEC 60072-1:2024-05. It applies to rotating electrical machines with shaft heights from 56 to 400 mm and flanges with pitch circle diameters from 55 to 1,080 mm. It contains tables for mounting dimensions, shaft extension dimensions and the assignment of rated outputs to frame sizes, specifies tolerances for foot-mounted and flange-mounted machines, and has replaced the former DIN EN 50347:2003-09[1]. How power and frame size are related is explained in our article Understanding kW motors.

The mounting designations such as IM B5 or IM B14 come from a second standard: DIN EN IEC 60034-7:2023-10 classifies types of construction, mounting arrangements and the terminal box position with the IM code[2][3]; machines with a horizontal shaft carry designations there that begin with “IM B”. They appear on the nameplate and in the dimension sheet of the motor.

B5 and B14 flange compared

The main difference lies in the type of holes. The B5 flange is an FF flange with through holes, the B14 flange an FT flange with tapped holes[4]. This determines the mounting direction: with B5, the bolts are inserted from the motor side through the flange into the mating side. With B14, the bolts engage from the machine side through the mating flange into the thread of the motor flange.

FeatureB5 (FF flange)B14 (FT flange)
Holes in the motor flangethrough holestapped holes
Boltingfrom the motor sidefrom the machine side
Flange sizelarger for the same frame sizesmaller, as “small” or “large”
Frame sizes in the dimension table according to the IEC standard56 to 31556 to 160
Example frame size 132 (outside diameter / pitch circle)300 / 265 mm200 / 165 mm (small), 250 / 215 mm (large)

For the same frame size, the B5 flange has the larger pitch circle[4] and thus the larger lever arm against tilting and radial loads. For heavy attachments or high transverse forces, it is therefore usually the more robust interface, whereas B14 is the more compact one. There are also machines with feet and flange, which IEC 60034-7 lists as a separate group of types of construction[3]. They can be supported by the feet and centred by the flange; the dimension sheet shows which type of holes the flange has.

Flange dimensions by frame size: B5, small B14 and large B14

The following overview shows shaft and flange dimensions according to the IEC standard for three-phase motors, each as outside diameter / pitch circle in mm[4]:

Frame sizeShaft (mm)B5 (FF)B14 large (FT)B14 small (FT)
569 × 20120 / 100105 / 8580 / 65
6311 × 23140 / 115120 / 10090 / 75
7114 × 30160 / 130140 / 115105 / 85
8019 × 40200 / 165160 / 130120 / 100
9024 × 50200 / 165160 / 130140 / 115
10028 × 60250 / 215200 / 165160 / 130
11228 × 60250 / 215200 / 165160 / 130
13238 × 80300 / 265250 / 215200 / 165
16042 × 110350 / 300300 / 265250 / 215

From frame size 180, the table only lists B5 flanges, up to frame size 315 with an outside diameter of 660 mm and a pitch circle of 600 mm[4]. Three patterns are important in practice:

  • Small B14 and large B14 are both FT flanges with threads, but they differ in the pitch circle. For frame size 71, it is 85 mm (small) and 115 mm (large). Abbreviations such as B14kl and B14gr (from German klein = small, groß = large) help to distinguish them but do not replace the dimensions[4].
  • The dimensions of the large B14 often correspond to those of a smaller B5 flange; for frame size 71, for example, to the B5 of frame size 63 with 140 / 115 mm. The type of holes is nevertheless different: thread instead of through hole[4].
  • Several frame sizes share one flange, for example 80 and 90 with the B5 at 200 / 165 mm. The shaft is nevertheless different (19 × 40 mm compared with 24 × 50 mm)[4].

The data in the dimension sheet of the specific motor are always binding. How to read the dimension sheet and nameplate is shown in our article on electric motor drawings.

Fit and runout at the spigot

The spigot locates the motor concentrically in the mating flange; the bolts only provide the frictional connection. Its tolerance is stated in the dimension sheet as an ISO tolerance. Lower-case letters denote shaft or external dimensions, upper-case letters denote holes. In the hole-basis system, all holes are manufactured with the same tolerance, for example H7, and the fit is selected via the tolerance of the external dimension. An H7/j6 pairing is a transition fit: depending on the actual size, there is slight clearance or slight interference, and the parts can be joined by hand or with light blows[5].

In addition to the fit, the runout of the shaft end as well as the coaxiality and axial runout of the flange count. DIN EN IEC 60072-1 describes measurement methods for the runout of the shaft end and the concentricity of the shaft[1]. The former DIN 42955 now only applies as DIN SPEC 42955:2012-04 to frame sizes above 315; ISO tolerances according to DIN EN ISO 286-2 were added for shaft diameter and mounting flange[6].

If the motor is mounted directly on a gearbox, every deviation has a direct effect on bearings and gearing. Before mounting, therefore, check whether the flange surfaces are clean and undamaged and are in full-surface contact.

Tightening torques of the flange bolts according to VDI 2230

Flange bolts are calculated connections. With an M10 bolt with µ = 0.12, around 85 % of the tightening torque consists of friction in the thread and under the head; only the remainder generates preload force. The coefficient of friction therefore determines which clamping force actually results[7].

ParameterGuide value
Tightening torque M10, property class 8.8, µ = 0.12, 90 % utilization of yield strength48 Nm (preload force 29.6 kN)
Scatter of the preload force with torque-controlled tightening±17 % to ±43 % depending on preparation
Tightening factor αA, torque wrench with target torque determined on the original part1.4 to 1.6
Tightening factor αA across all tightening methods1.2 to 4

The values only apply to the conditions stated[7]. Other coefficients of friction, coatings or lubricants shift the correct torque significantly. Tighten the bolts crosswise and in stages so that the flange does not distort. With B14, the following also applies: the thread engagement depth in the motor flange is limited. Take the permissible bolt length from the dimension sheet so that the bolt does not reach into the inside of the motor.

Avoiding typical errors when replacing a motor

Most problems arise during ordering and mounting, not in the standard. These checks avoid them:

  • Define the mounting type: B5, B14 or a version with feet and flange. For B14, also specify small or large.
  • Measure on the existing motor: outside diameter, pitch circle, spigot diameter, hole diameter or thread, as well as shaft diameter and length.
  • Check the type of holes: through hole (B5) or thread (B14)[4]. Particularly with older or non-standard existing motors, dimensions and holes may deviate from today’s standard.
  • Do not order by power alone: the same kW rating does not mean the same frame size, and the same frame size does not mean the same flange[4].
  • Coordinate the fit and tightening torques with the mating flange and limit the bolt length with B14.

Our article on IEC electric motors gives an overview of frame sizes and standards for standard motors. Flange selection is part of the design of the entire drive train: motor, gearbox and brake must match mechanically and functionally. As a supplier for the complete drive train, we at ATEK Drive Solutions design these components to fit precisely from a single source. Our gearboxes with motor flange are available, among others, as bevel and worm gearboxes with IEC motor flange and with servo flange. We will be happy to advise you on your specific interface via our contact page.

Frequently asked questions

What is the difference between a B5 and a B14 flange?

The B5 flange (FF) has through holes and is bolted from the motor side. The B14 flange (FT) has tapped holes; the bolts come from the machine side through the mating flange. For the same frame size, the B5 flange is larger, for example at frame size 132 with an outside diameter of 300 mm and a pitch circle of 265 mm.

What are the dimensions of a B14 flange?

That depends on the frame size and version. For frame size 71, the small B14 has an outside diameter of 105 mm and a pitch circle of 85 mm, the large B14 140 mm and 115 mm. For frame size 132, it is 200 / 165 mm (small) and 250 / 215 mm (large). The motor’s dimension sheet is binding.

What do small B14 and large B14 mean?

Both are FT flanges with tapped holes, but with different outside diameters, pitch circles and spigot diameters. They are not interchangeable. Abbreviations such as B14kl and B14gr help to distinguish them; you should nevertheless order by dimensions.

Can I replace a B14 motor with a B5 motor?

Not directly. The type of holes, the pitch circle and usually also the spigot diameter differ. A change requires a suitable mating flange or adapter on the gearbox or machine.

What fit does the spigot of a motor flange have?

The tolerance is stated as an ISO tolerance in the dimension sheet. If the spigot is manufactured in j6, for example, and the recess in H7, the result is a transition fit that can be joined by hand or with light blows.

Are there motors with feet and flange?

Yes. IEC 60034-7 lists machines with feet and flange as a separate group of types of construction. The motor can thus be supported by the feet and centred by the flange. The dimension sheet shows whether the flange has through or tapped holes.

What torque are flange bolts tightened to?

The torque is calculated according to VDI 2230 from bolt size, property class and coefficient of friction. A guide value for M10 in 8.8 at µ = 0.12 and 90 % utilization of yield strength is 48 Nm. This value does not apply under other friction conditions.

Which standard governs the flange dimensions of electric motors?

DIN EN IEC 60072-1:2024-05 for frame sizes 56 to 400 and flanges with pitch circles from 55 to 1,080 mm. It has replaced DIN EN 50347. The mounting designations such as IM B5 and IM B14 are governed by DIN EN IEC 60034-7.

Sources

  1. DIN Media (DE): DIN EN IEC 60072-1:2024-05
  2. DIN Media: DIN EN IEC 60034-7:2023-10
  3. VDE Verlag: IEC 60034-7:2020, preview (contents and scope)
  4. Dimension table (DE): shaft and flange dimensions according to the IEC standard for three-phase motors (PDF)
  5. Wikipedia (DE): Passung (fit)
  6. DIN Media (DE): DIN SPEC 42955:2012-04
  7. DS Werk (DE): Bolted joints according to VDI 2230